HIGHLAND — CALIFORNIA58 LOCAL. Highland Public Works identifies arterial resurfacing and a 9th Street pedestrian-and-bicycle upgrade among projects under active development or construction in its current public works directory.
Information for residents
The arterial resurfacing program includes asphalt repairs, road surface work, striping and adjustments to utilities. Listed safety features include buffered bike-lane changes, a flashing beacon at Greenspot Road and Club View Drive, bus-stop paving and intersection markings. Some segments on Greenspot Road and Park View Lane are deferred because other drainage projects are planned.
A separate improvement along the south side of 9th Street between Eucalyptus Drive and Victoria Avenue calls for pavement, curbs, gutters, sidewalks, driveways and upgraded bike lanes. The city says right-of-way proceedings delayed the work but construction has been moving forward.
Residents should use the city project directory and current contractor notices to identify closures or work-zone changes. A city project description should not be treated as a real-time statement about lane availability on a given day.
Primary source: City of Highland public information. Dates, plans and project statuses are subject to agency updates.
Support Highland News
Choose how to support Highland News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Highland News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Highland News
- Yaamava’ in Highland Plans Martha Stewart Holiday Experience Launch November 18 →
- Highland Calls Residents to November 7 Neighborhood Cleanup, 8 A.M. to Noon →
- Highland Election: Christy Marin Leads District 4; Measure E Has 59.61% Yes →
- Highland District 4: Christy Marin Leads Jason Isaacs in November 3 Early Count →
- Highland Reports $239 Million-Plus Five-Year Capital Improvement Outlook →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.